In making Stelrad/Henrad s after-treatment tunnel in Nuth more efficient, the radiator factory turned to technical service provider HAAN Industrial Group from Meerssen.
HAAN Industrial Group is developing, building and assembling the new aftertreatment tunnel which is scheduled to be operational by summer 2020, replacing the old tunnel. In the after-treatment tunnel, excess corrosion-resistant primer is rinsed off the radiators with UF (Ultra-Filtration) water. The radiators are then dried before the next treatment.
It is one of the many innovations Stelrad/Henrad is implementing to achieve greater optimisation of the production process.
For an overview of the project, see the attached video: https: //www.youtube.com/watch?v=CZvnrkUp2Fc